Every job below is one we do ourselves across Dunedin.
We build new decks from pressure-treated pine, cedar or composite, sized and designed around how you actually use your backyard. Footings, joist spacing and railing height are all set to current Florida building code, not just what looks right. Most standard decks go from permit to finished boards in two to three weeks, weather depending.
A soft spot in the decking almost always means water got under the surface and started rotting the wood from the inside, and it spreads if you ignore it. We pull the damaged boards, check the joists and ledger board underneath, and replace whatever's compromised instead of screwing a new board over the top. Railings that wiggle usually come down to a loose post connection, which we re-anchor properly.
Florida sun breaks down sealant fast, so a deck that looked fine two years ago can be graying and splintery now. We pressure wash the surface first, let it dry fully, then apply a stain and sealer rated for UV and standing water. We won't seal a deck that's still wet underneath, since the finish just fails again in a few months.
If you want something beyond a rectangle off the back door, we'll draw up a layout with multiple levels, built-in seating, or a design that works around an existing pool or tree. We walk through the drawing with you before any lumber gets ordered. Changes are a lot cheaper on paper than after the posts are set.
Composite boards cost more upfront than pressure-treated pine, but you're not out there sanding and re-staining them every couple of summers. We use hidden fastener systems on most composite installs so the deck surface doesn't have screw heads showing. It still requires the same solid framing underneath as a wood deck, that part doesn't change.
If the frame underneath your deck is still solid but the boards are cupped, splintered or just worn out, we can replace the decking surface without tearing out the whole structure. This usually costs less than a full rebuild and takes a few days instead of a few weeks. We check every joist first, since there's no point putting new boards over a frame that's failing.
A screened enclosure built onto an existing deck keeps out mosquitoes and no-see-ums without losing the space you already have. We frame it to tie into your roofline and existing deck structure, not bolted on as an afterthought. Screen panels and door hardware are picked for how much coastal humidity and salt air they'll hold up against.
Loose, leaning or missing railings are a liability as much as an eyesore, and most county codes require a certain height and baluster spacing for anything over 30 inches off the ground. We rebuild railing posts with proper structural connections instead of toe-nailing them back in. Cable rail, wood baluster and aluminum options are all available depending on the look you want.
A pergola over part of your deck cuts down the afternoon sun without blocking the whole view, and it's a straightforward add-on if your existing deck framing can carry the load. We check the posts and footings before attaching anything, since an undersized structure will work loose in a storm. Cedar, pressure-treated pine and aluminum are all options depending on how much upkeep you want to do.
Sometimes the right call is tearing out an old deck entirely rather than patching it board by board, especially if the framing's rotted through or the footings were never set right. We handle the demo, haul away the old lumber, and leave the site ready for whatever comes next. If you're having us build the replacement, we roll the demo into the same job.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
We bring the same crew and equipment to every town on this list.
Questions that come up once a deck project is actually underway.
Describe the problem and we will tell you what it probably is. No obligation.